i. This Monthly
Environmental Monitoring and Audit (EM&A) Report is prepared for Contract
No. SPW 07/2020 “Environmental Team for Construction of Yuen Long Effluent
Polishing Plant Stage 1”. Drainage Services Department (DSD) has appointed
Fugro Technical Services Limited (FTS) to undertake the Environmental Team
services for the project and implement the EM&A works.
ii. This is the 8th Monthly
EM&A Report for the Contract which summaries findings of the EM&A
programme during the reporting period from 1 November 2021 to 30 November 2021.
As informed by the Contractor, major activities in the reporting month were:
Breaches of Environmental Quality Performance Limits (AL levels)
iii. No Action and
Limit Level exceedance was recorded for air quality monitoring and construction
noise monitoring in the reporting month.
iv. No Action and
Limit Level exceedance was recorded for water quality monitoring in the
reporting month.
v. No Action / Limit exceedance was recorded for noise levels at stations
(NMS1 and NMS2) in close proximity to the two active
ardeid night roosts (ANR1 and ANR2) observed within the Survey Area during the
reporting month.
vi.
No Action / Limit exceedance for the ecological monitoring of birds in
the reporting month.
vii. No corrective
actions were required according to the Event-Action Plans.
Land Contamination
viii. Regular site
inspection was carried out to ensure the recommended mitigation measures are properly
implemented. Site investigation (SI) work was completed by 4th
August 2021 and the signed final Contamination Assessment Report (CAR) for Main
Storeroom & Workshops was submitted to EPD on 1 November 2021. The signed
final Contamination Assessment Report (CAR) for Mechanical Workshop was
submitted to EPD on 23rd November 2021. No contaminated soil and ground water was found within the Main Storeroom & Workshop and the
Mechanical Workshop, hence no remedial action is required.
Complaint Log
ix. No complaints were
received in the reporting period.
Notifications of any Summons and Successful Prosecutions
x. No notifications
of summons and prosecutions were received in the reporting period.
Reporting Change
xi. There were no
reporting changes during the reporting month.
Future Key Issues
xii. The main works
will be anticipated in the next three months are as follow:
9. NON-COMPLIANCE,
COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
10. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2 Environmental
Licenses, Notification and Permits Summary
Table 2.1 Air
Quality Monitoring Equipment
Table 2.2 Air
Quality Monitoring Location
Table 2.3 Summary
of Air Quality Monitoring Results
Table 2.4 Comparison of
1-hr TSP data with EIA predictions
Table 3.1 Construction
Noise Monitoring Equipment
Table 3.2 Monitoring
Parameters and Frequencies of Noise Monitoring
Table 3.3 Construction
Noise Monitoring Location
Table 3.4 Summary
of Construction Noise Monitoring Results
Table 3.5 Comparison of
Noise monitoring data with EIA predictions
Table 4.1 Water Quality Monitoring and Sampling
Equipment
Table 4.2 Monitoring Parameters and Frequency
Table 4.3 Coordinates
of Water Quality Monitoring Locations
Table 4.4 Summary of Water
Quality Exceedance
Table 5.1 Noise
Monitoring Parameters (For Active Ardeid Night Roost Survey)
Table 5.2 Active Ardeid
Night Roost Survey Findings
Table 5.3 Noise
Monitoring Results (For Active Ardeid Night Roost Survey)
Table 5.4 Noise Monitoring
Parameters
Table 5.5 Abundance of
all Avifauna Species
Table 5.6 Abundance of
Species of Conservation Importance
Table 5.7 Shannon
Diversity Index Value of all Avifauna Species
Table 5.8 Shannon
Diversity Index Value of Species with Conservation Importance
Table 5.9 Wetland
habitat utilization of all avifauna species
Table 5.10 Wetland
habitat utilization of avifauna species of conservation importance
Table 5.11 Wetland habitat utilization of
overwintering avifauna species
Table 5.12 Noise Monitoring Results (For
Ecological Monitoring of Birds)
Table 8.1 – Waste
Generated by the Construction and Disposal Ground
Table 10.1 – Summary of EP Submissions Status
Figures
Figure 1 Location of Proposed Yuen Long Effluent Polishing Plant
Figure
2 Air Quality Monitoring Locations
Figure
3 Noise Monitoring Locations
Appendices
Appendix A Construction
Programme
Appendix B Project Organization Chart
Appendix C Action and Limit Levels
Appendix D Calibration Certificate of Monitoring Equipment
Appendix E Environmental Monitoring Schedule
Appendix H Event and Action Plan
Appendix J Implementation Status of Environment Mitigation Measures
Appendix K Weather and Meteorological Conditions
Appendix M Summary of the ET Leader’s Site Environmental Audit in the
Reporting Month
Appendix N Outstanding Issues and Deficiencies
Appendix O Active Night Roost Monitoring Area and Vantage Points; and Noise Monitoring
Stations
Appendix P Ecological
Bird Monitoring Area with Locations of Point Count Sites and Transect Route